WA Sand Supply and Haulage is contracted by GNC, a joint venture between BGC and Laing O’Rourke for the load and haulage works. The $1.02 billion NorthLink WA will link to Gateway WA, servicing regional traffic movements to commercial and industrial areas such as Malaga, Kewdale, Perth Airport, and the Perth CBD a key element in guiding a stronger and more prosperous economy for Western Australia. The second stage, Central Section, is extending Tonkin Highway from Reid Highway to Ellenbrook, improving access to surrounding suburbs, as well as duplicating Reid Highway through to Altone Road.
You and your employees are required to register and induct through the Online Induction system.
Step 1. Employees and Sub-Contractor Drivers
If you are an employee/subcontractor/labour hire you are required to register your details and complete the Online Induction.
You will be required to upload evidence of training and qualifications/competencies, so please ensure these are available to upload.
You must monitor your emails following the registration in the event your uploads are rejected (eg. unreadable, expired or insufficient).
Click here to register